A New Class of LRF Binoculars Has Arrived

FEATURES     |      TECH SPECS     |      AVAILABILITY AND PRE-ORDER

SYNERGY™ is built on a performance-first architecture that fundamentally redefines what a laser rangefinding binocular can be. 

It delivers a level of speed, clarity, and ballistic intelligence never before available in a handheld optical system.

THIS IS NOT AN EVOLUTION OF AN EXISTING DESIGN

It is a complete platform built from the ground up for elite competitors, professional users, and serious precision shooters who require instant, reliable decision-making in the field.

The unparalleled 12×50 ED optical platform delivers superior light transmission, resolution, and target definition compared to conventional 42mm systems. 

This is not built for everyone.

It is built for those who demand the fastest decisions, the clearest sight picture, unmistakeable data, and the highest probability of first-round hits.

FEATURE HIGHLIGHTS

LUMACORE™ is the brightest, highest-resolution MicroOLED HUD ever placed in an LRF binocular. 

With 4X the pixel density of competing systems, it delivers razor-sharp reticles, target data, and ballistic solutions without obscuring your view of the real world.

The NEURAL-AX™ Engine, featuring the Applied Ballistics® ELITE solver, transforms raw range and environmental data into precise firing solutions in real time.

Built for speed, accuracy, and reliability, it is the computational core that makes SYNERGY more than just an optic.

The RTX™ Laser System delivers the fastest ranging performance ever built into an LRF binocular. Near-instant ranging and rapid target reacquisition allow you to move from scan to solution without delay, even on small or moving targets up to 5,000 yards.

Our exclusive OMNIMODE™  Operating System allows SYNERGY to instantly adapt to how you shoot and what you’re doing.

Switch between general use, hunting, PRS, NRL Hunter, team and tactical modes, each optimized for its specific workflow and data presentation. 

OMNIMODE™ shows you the right data, when you need it.

The GHOST™ Digital Reticle allows a high-resolution illuminated digital reticle with 0.2MIL subtensions to be displayed instantly without activating the laser or ballistic engine.

Observe, range, or engage with complete visibility and control in daylight or low-light conditions, using a true two-in-one optical platform that doesn’t make you compromise.
Easily switch between modes with the touch of a button.

WINDLOCK™ integrates wind inputs and data streams directly into your ballistic solution.

Whether entered manually via our QuickWind Workflow, or received from connected devices, wind becomes a locked, synchronized part of every firing solution.

For the first time ever, MATCH COMMAND™ allows you to preload stages, targets, and engagement data directly into SYNERGY with Applied Ballistics Quantum™Â for known-distance matches.

Tag, confirm, and manage targets on the fly while capturing direction of fire and ballistic context, giving you the edge on every stage.

The exclusive ED glass 12×50 optical system delivers higher light transmission, better resolution, and greater target definition than conventional 42mm designs, without any perceived hue or strange coloring.

See more, resolve more, and identify targets with confidence in any lighting condition.

The ENVIRONEX™ sensor array continuously measures temperature, pressure, humidity, and orientation to ensure every ballistic solution reflects real-world conditions.

The highest quality sensors available built-in. No external sensors required. No guesswork. Just accuracy!

TECH SPECS

1. Optical Performance
Configuration12x50mm
Glass TypeJapanese ED (Extra-Low Dispersion)
Prism SystemBAK4 Phase-Corrected
Lens CoatingsFully Broadband Multi-Coated
Field of View279 ft @ 1,000 yds (5.3°)
Light Transmission92% @ 550nm
Eye Relief14.3mm
2. Laser Rangefinder Capabilities
Max Range (Reflective)5,000 Yards
Range (Tree)2,000 Yards
Range (Deer)1,200 Yards
Response Time< 0.25 Seconds
Accuracy+/- 1 Yard
Laser Wavelength905nm (Class 1 Eye Safe)
Beam Divergence1.5 x 0.1 MRAD
3. Features & Display
Display TypeUltra-HD High Brightness OLED
Brightness Settings5-Level Adjustment
ConnectivityBluetooth® Enabled
Ballistic SolverApplied Ballistics® Elite Onboard Solver
App ControlApplied Ballistics® QUANTUM
InclinometerAngle Compensation (+/- 1°)
4. Build & Durability
Chassis MaterialMagnesium Alloy (Rugged)
Environmental ProtectionIPX7 Nitrogen Purged
Operating Temp-20°C to +55°C
Power Supply1x CR123 (3V) Battery

AVAILABILITY AND PRE-ORDERS

EARLY ALLOCATION ACCESS IS LIMITED!

SYNERGY™ 12×50 will be produced in limited volumes due to its advanced optical, laser, and display architecture. Initial production will be allocated first to customers who secure early access before public release.

PRE-ORDERS ARE NOW OPEN 

Quantities will be assigned strictly by
priority tier and reservation order.

Priority 1

Pay in full and receive a unit from the priority production run.

Priority 2

Reserve with a 50% deposit and receive a unit from the second priority production run.

Both tiers guarantee your place in line. Priority determines when your unit ships.

Pre-orders reserve your allocation. Deposits are non-refundable. Full payment orders are subject to the Reservation Terms and Conditions.

SYNERGY™ PRE-ORDER TERMS AND CONDITIONS

The SYNERGY™ Laser Rangefinding Binocular is a limited-production product manufactured in controlled batches due to the complexity and availability of specialized components, including advanced display and laser systems. By placing a pre-order, you acknowledge and agree to the following terms:

  1. Allocation of Units

    All pre-orders are used to secure and allocate units within a specific production run. Placement of a pre-order constitutes a commitment to purchase and reserves your position in the fulfillment queue. Allocations are fulfilled strictly in the order in which orders are received.

  2. Priority 1 Orders (Full Payment)

    Orders placed under the full payment option are considered Priority 1 allocations and are scheduled for earliest available delivery. A portion of each full payment order is deemed a non-refundable allocation deposit, representing costs incurred by Apex Optics in securing components, production capacity, payment processing, and administrative handling associated with your reserved unit. In the event of a cancellation request prior to shipment, the non-refundable allocation deposit will be retained and any remaining balance may be refunded at the sole discretion of Apex Optics. All refunds are subject to a cancellation and processing fee of up to 5% of the total order value to account for non-recoverable transaction costs, including credit card processing fees. Once an order has entered final processing or shipment, it is no longer eligible for cancellation.

  3. Priority 2 Orders (Deposit-Based)

    Orders placed under the deposit option are considered Priority 2 allocations and secure placement in a subsequent production batch. All deposits are strictly non-refundable. The deposit represents a binding commitment and is applied toward reservation of limited production capacity, allocation of components and materials, and associated transaction, administrative, and planning costs. Due to the made-to-allocation nature of the product, deposits cannot be refunded under any circumstances, including but not limited to changes in personal circumstances, delays, or revised delivery timelines.

  4. Order Transfers

    Pre-orders may be transferred to another customer upon written request and approval by Apex Optics. While Apex Optics may assist in facilitating such transfers, it is not obligated to do so. All transfers must be completed prior to shipment and are subject to verification and administrative processing.

  5. Production and Delivery Estimates

    All delivery timelines provided are estimates only and are subject to change based on manufacturing schedules, component availability, and logistical factors outside of Apex Optics’ control. Delays in production or delivery shall not constitute grounds for cancellation or refund beyond the terms outlined above.

  6. Payment Processing and Fees

    By placing a pre-order, you acknowledge that payment processing fees are incurred at the time of transaction and are non-recoverable by Apex Optics in the event of a cancellation. Applicable fees are accounted for within the cancellation terms outlined herein.

  7. Modifications to Terms

    Apex Optics reserves the right to modify or update these Pre-Order Terms and Conditions at any time, provided that such changes do not materially affect existing confirmed allocations.

  8. Acceptance of Terms

    By completing your purchase, you acknowledge that you have read, understood, and agreed to these Pre-Order Terms and Conditions in full.

THIS IS SYNERGY™

A new standard for what an

LRF binocular should be.

© 2026 APEX OPTICS. ALL RIGHTS RESERVED. PATENTS AND TRADEMARKS PENDING